Table 20 Production fluids handling
RTD TOPICS/ OBJECTIVES Category
1. To develop measures to reduce volumes of produced water: TE+CR+E
- see references to water shut-off in Section 4.3 and 5.2. Technology
options for down-hole separation and produced water re-injection also
exist, although the former is not mature.
2. To improve effectiveness of produced water clean-up before surface disposal: TE + CR
- regulations govern allowable discharges offshore Europe and these may
become more restrictive in future.
3. To improve understanding of the partitioning of production chemicals into TE + E
water and oil.
(Asset focus of the above topics: all fields producing water)
TE- technology enhancement. CR- cost reduction. E- enabling.