General Aims

We are constantly on the lookout for possible improvements in efficiency. One of successes in this area was the introduction in Norway of the double drum Wireline unit with logging cable. this makes it possible for one crew to perform slickline operations and with the addition of a logging engineer, they can convert to logging operations with minimum disruption. this enables reduced manning levels leading to a more efficient operation.